Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                            Site: 28 AM BG+Dev Existing
Emu Mountain Road/Walter Hay Drive/Eumarella Road
2028 AM Peak Background+Development Traffic
Existing Layout
Roundabout



 Lane Use and Performance
                  Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane     SL    Cap. Prob.
                L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length Type      Adj. Block.
            veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m             %      %
 South: Emu Mountain Road
                                                        6
 Lane 1      374 281        0   655 5.0 1386 0.473   98     4.0  LOS A        3.7     27.0   500     –      0.0    0.0
 Lane 2         0 910       3   913 5.0 1902 0.480 100      3.7  LOS A        4.0     29.5   140 Turn Bay 0.0      0.0
 Approach       374 1192        3   1568 5.0           0.480               3.8   LOS A          4.0         29.5

 East: Eumarella Road
 Lane 1         17    22       48      87 5.0     730 0.120     100       11.3   LOS A          0.6          4.7   500    –       0.0   0.0
 Approach       17    22       48      87 5.0         0.120               11.3   LOS A          0.6          4.7

 North: Walter Hay Drive
 Lane 1         23 475         0     498 5.0 1335 0.373         100        4.3   LOS A          2.8         20.3   500     –      0.0   0.0
 Lane 2          0 203       188     392 5.0 1050 0.373         100        8.6   LOS A          2.5         18.4   150 Turn Bay   0.0   0.0
 Approach        23   678    188     889 5.0           0.373               6.2   LOS A          2.8         20.3

 West: Emu Mountain Road
 Lane 1     331      0   0           331 5.0      678 0.487     100       9.4    LOS A          3.3         24.3   500     –      0.0   0.0
                                                                    5
 Lane 2       0     13 433           445 5.0      997 0.446      92      14.9    LOS B          3.4         24.5   200 Turn Bay   0.0   0.0
 Approach       331    13    433     776 5.0           0.487             12.5    LOS A          3.4         24.5

 Intersection                       3321 5.0           0.487               6.7   LOS A          4.0         29.5


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.

5 Lane underutilisation determined by program
6 Lane underutilisation due to downstream effects

Processed: Monday, 5 August 2013 3:06:14 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\2 Emu Mountain_Walter Hay_Eumarella 2013 04
15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.