Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                       Site: 28PM BG Mitigated
Walter Hay Drive/Eenie Creek Road
2028 PM Peak Background Traffic
Mitigated Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                            SL      Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                          Type      Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                     %       %
 South: Walter Hay Drive
 Lane 1         85 247 157       489 5.0 1107 0.442 100      8.1  LOS A        3.0     22.1   280                           –        0.0    0.0
 Lane 2          0     0 350     350 5.0 791 0.442 100      14.8 LOS B         2.7     19.9   280                           –        0.0    0.0
 Approach        85   247    506     839 5.0           0.442             10.9    LOS A          3.0         22.1

 East: Eenie Creek Road
 Lane 1       438 309          0     747 5.0 1359 0.550         100        4.8   LOS A          4.1         30.0     500    –        0.0    0.0
 Lane 2          0 348       231     579 5.0 1053 0.550         100        8.8   LOS A          3.9         28.8     500    –        0.0    0.0
 Approach       438   658    231    1326 5.0           0.550               6.5   LOS A          4.1         30.0

 North: Walter Hay Drive
 Lane 1        268 148         0     416 5.0 1108 0.376         100        5.4   LOS A          2.2         16.2      40 Turn Bay    0.0    0.0
 Lane 2          0 181       103     284 5.0 756 0.376          100        9.6   LOS A          2.0         14.5     500     –       0.0    0.0
 Approach      268 328       103     700 5.0      0.376                    7.1   LOS A          2.2         16.2

 West: Eenie Creek Road
 Lane 1       160 367          0     527 5.0     1112 0.473     100        5.6   LOS A          3.4         24.5     140    –        0.0    0.0
 Lane 2         0 270        106     377 5.0      795 0.473     100        9.2   LOS A          3.0         22.0     140    –        0.0    0.0
 Approach       160   637    106     903 5.0           0.473               7.1   LOS A          3.4         24.5

 Intersection                       3768 5.0           0.550               7.7   LOS A          4.1         30.0


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:41:03 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.