LANE SUMMARY                                                                                           Site: 28AM BG+Dev Mitigated
Walter Hay Drive/Eenie Creek Road
2028 AM Peak Background+Development Traffic
Mitigated Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                          SL      Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                        Type      Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                   %       %
 South: Walter Hay Drive
 Lane 1        198 502      91   791 5.0 1004 0.788 100     11.6  LOS A        9.2     67.3   280                         –        0.0    0.0
 Lane 2          0     0 550     550 5.0 698 0.788 100      21.4 LOS B         7.8     56.9   280                         –        0.0    0.0
 Approach       198   502    641    1341 5.0           0.788             15.6    LOS B          9.2         67.3

 East: Eenie Creek Road
 Lane 1       474 394          0     868 5.0 1350 0.643         100       5.3    LOS A          5.8         42.6   500    –        0.0    0.0
 Lane 2          0 342       334     676 5.0 1052 0.643         100      10.2    LOS A          5.6         40.7   500    –        0.0    0.0
 Approach       474   737    334    1544 5.0           0.643               7.4   LOS A          5.8         42.6

 North: Walter Hay Drive
 Lane 1        302 130          0    432 5.0      872 0.496     100       8.6    LOS A          4.0         29.2    40 Turn Bay    0.0    0.0
 Lane 2          0    211      78    289 5.0      582 0.496     100      12.8    LOS A          3.3         24.2    40     –       0.0    0.0
 Approach      302 341         78    721 5.0          0.496              10.3    LOS A          4.0         29.2

 West: Eenie Creek Road
 Lane 1        88 478           0    566 5.0      791 0.716     100      12.3    LOS A          7.6         55.2   140    –        0.0    0.0
 Lane 2         0 287          91    378 5.0      528 0.716     100      16.9    LOS B          6.0         44.1   140    –        0.0    0.0
 Approach        88   765      91    944 5.0           0.716             14.1    LOS A          7.6         55.2

 Intersection                       4551 5.0           0.788              11.7   LOS A          9.2         67.3


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:41:05 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.