Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                 Access Options Assessment
                                                                                                           Noosa on Weyba




4                Option 1 Assessment
4.1              Transport
Table 4-1        Option 1 Assessment - Transport
      Criteria                        Description                    Score                   Justification
                                                                             Without connectivity to Walter Hay Drive or
                                                                             to either side of the road, there are
                                                                             effectively two separate developments which
                        How easily does this access option
                                                                             are difficult to travel between other than via
                        provide connectivity between the two
Connectivity –                                                               a circuitous route. It should be noted that the
                        sides of the development and                  1
Private Vehicles                                                             development is proposed to be established
                        provide connectivity to the wider road
                                                                             under an overarching community title
                        network
                                                                             scheme, which would be difficult if the two
                                                                             sections of the development are so
                                                                             segregated.
                                                                             Public transport connectivity would be
                                                                             extremely difficult with this access
                        The ability to provide a realistic and
Connectivity –                                                               arrangement, as to serve the development
                        suitable layout for public transport          1
Public Transport                                                             would require two separate services with
                        with this access option
                                                                             dead end running of between 2km and
                                                                             2.5km.
                                                                             Residential amenity would be compromised
                        The impact that this access option
                                                                             for existing residents on both Hollett Road
                        will have on the amenity of the
Residential Amenity                                                   1      and Tidswell Road as the full traffic
                        surrounding residential areas and
                                                                             generated by the development would pass
                        road networks
                                                                             by their houses.
                                                                             This option still provides opportunity to
Connectivity –          How conducive the proposed access                    provide pedestrian and cycle connectivity to
Pedestrian and          solution is to encouraging the use of         4      the existing facilities and to access each
Cyclist                 Active Travel Modes                                  side of the development via the existing
                                                                             underpass.
                                                                             This option would cause limited delay to
                        A high level estimate of the impact
                                                                             Walter Hay Drive with only the eastern half
Delay to Traffic on     that an access of this type will have
                                                                      5      of the development impeding traffic on
Walter Hay Drive        on traffic capacity of Walter Hay
                                                                             Walter Hay Drive at the intersection with
                        Drive
                                                                             Emu Mountain Road and Eumarella Road.
                        Average Score                                 2.4


4.2              Ecology
Table 4-2        Option 1 Assessment - Ecology
      Criteria                        Description                    Score                   Justification
                        The impact that each option will have                This option will involve substantial clearance
                        on the extent of wildlife habitat in the             of existing wildlife habitat to facilitate
                        locality. The rating of the option is                necessary upgrades to both Hollett Road
Habitat Loss                                                          1
                        inversely related to the associated                  and Tidswell Road. Approximately 2.75km
                        extent of vegetation and habitat                     of Hollett Road and 1.5km of Tidswell Road
                        clearance.                                           will need to be upgraded.
                        The impact that each option will have
                        on the movement of native wildlife
                        between areas of high value                          This option will result in the establishment of
                        bushland that is dissected by the                    approximately 2.75 km of upgraded roadway
Habitat
                        road option. The rating of the option         1      that traverses otherwise contiguous areas of
Fragmentation
                        is inversely related to the length of                high value bushland habitat situated either
                        roadway that is established and                      side of the roadways.
                        operated through areas of high value
                        bushland (e.g. remnant vegetation

510119 13 September 2013                                    Cardno                                       13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                       Page 10

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.