Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                Access Options Assessment
                                                                                                          Noosa on Weyba



       Criteria                       Description                  Score                    Justification
                        and Koala Bushland habitat).
                        There is a relationship between
                        traffic volumes and velocities and the             All of the traffic generated by the
                        likelihood of wildlife mortality (and              development would be directed onto Hollett
                        morbidity). The rating of each option              Road and Tidswell Road, which do not have
                        is inversely related to:                           fauna exclusion fencing
                         the capacity to maintain low                     Both Hollett Road and Tidswell Road have
Road Mortality               vehicular speeds (i.e. < 50 kph)       1      relatively long straight stretches of roadway
                             through road geometry and                     that will make it difficult to maintain vehicular
                             passive engineering design; and               speeds at or below 50kph through
                         the volume of traffic on the                     engineering design.
                             roadways that traverse wildlife               Consequently there is an increased risk of
                             habitat areas and which do not                road trauma for native fauna.
                             have fauna exclusion fencing.
                        Average Score                               1.0


4.3               Civil Engineering
Table 4-3         Option 1 Assessment – Civil Engineering
       Criteria                       Description                  Score                    Justification
                                                                           This option will have reduced costs due to
                                                                           no works required on Walter Hay Dr but will
                        The economic cost of the roadworks
                                                                           have considerable cost associated with
                        and     associated    infrastructure.
Cost                                                                4      Eumundi-Noosa Road intersection and
                        Highest cost will equal the lowest
                                                                           requires an extra culvert crossing at the
                        number.
                                                                           western end of Hollet Road, compared to
                                                                           other options
                                                                           The roads will cross all the known drainage
                        The effect of the road on the
                                                                           paths and will require appropriate culverts to
Stormwater              stormwater and flooding aspects of          3
                                                                           convey the stormwater. The works will not
                        the site
                                                                           have any detrimental effect on flood levels.
                        Average Score                               3.5


4.4               Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 1 has an
overall score of 6.9.




510119 13 September 2013                                  Cardno                                        13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                      Page 11

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.