Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
5 Option 1A Assessment
5.1 Transport
Table 5-1 Option 1A Assessment - Transport
Criteria Description Score Justification
Although this option provides good vehicular
How easily does this access option connection between each half of the
provide connectivity between the two development, there are still issues with
Connectivity –
sides of the development and 2 providing connection to the north for the
Private Vehicles
provide connectivity to the wider road eastern section of the development and puts
network more pressure on the substandard Hollett
Road/Eumundi-Noosa Road intersection.
Offers the ability to provide a connection for
buses from Eumundi-Noosa Road to
The ability to provide a realistic and
Connectivity – Eumarella Road. However, on both sections
suitable layout for public transport 3
Public Transport there are no existing services that could be
with this access option
used to link into. This could result in an
underutilised and unpopular service.
Residential amenity would be compromised
The impact that this access option
for existing residents on both Hollett Road
will have on the amenity of the
Residential Amenity 1 and Tidswell Road as the full traffic
surrounding residential areas and
generated by the development would pass
road networks
by their houses.
This option still provides opportunity to
Connectivity – How conducive the proposed access provide pedestrian and cycle connectivity to
Pedestrian and solution is to encouraging the use of 4 the existing facilities and to access each
Cyclist Active Travel Modes side of the development via the existing
underpass.
This option would cause limited delay to
A high level estimate of the impact
Walter Hay Drive with only the eastern half
Delay to Traffic on that an access of this type will have
5 of the development impeding traffic on
Walter Hay Drive on traffic capacity of Walter Hay
Walter Hay Drive at the intersection with
Drive
Emu Mountain Road and Eumarella Road.
Average Score 3.0
5.2 Ecology
Table 5-2 Option 1A Assessment - Ecology
Criteria Description Score Justification
The impact that each option will have
on the extent of wildlife habitat in the This option is essentially the same as Option
locality. The rating of the option is 1 in respect of Habitat Loss, with
Habitat Loss 1
inversely related to the associated approximately 300m of additional road works
extent of vegetation and habitat and associated habitat clearance.
clearance.
This Option will result in further
The impact that each option will have fragmentation of habitat areas. Of particular
on the movement of native wildlife note is the fact that the existing emergency
between areas of high value access culvert beneath Walter Hay Drive
bushland that is dissected by the acts as a fauna underpass enabling native
Habitat road option. The rating of the option wildlife to move with relative safety between
1
Fragmentation is inversely related to the length of habitat located to the east and west of
roadway that is established and Walter Hay Drive. By upgrading this
operated through areas of high value underpass to cater for traffic generated by
bushland (e.g. remnant vegetation the proposed development this wildlife
and Koala Bushland habitat). underpass function would be lost. Native
fauna accustomed to using this structure will
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.