Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
Criteria Description Score Justification
reduction of approximately 56% in the extent
of habitat loss compared to Option 1 and
45% in comparison to Options 2, 3 and 5.
The impact that each option will have This option will substantially reduce the
on the movement of native wildlife length of roadway that traverses otherwise
between areas of high value contiguous areas of high value bushland
bushland that is dissected by the habitat.
road option. The rating of the option Under Option 4 approximately 0.95km of
Habitat is inversely related to the length of 4 upgraded roadway would traverse areas of
Fragmentation roadway that is established and high value bushland habitat, compared to
operated through areas of high value Options 2, 3 and 5, which would result in the
bushland (e.g. remnant vegetation establishment of approximately 2.25 km of
and Koala Bushland habitat). upgraded roadway through areas of high
value bushland habitat.
There is a relationship between Relative to all other Options, a greater
traffic volumes and velocities and the proportion of the traffic generated by the
likelihood that wildlife mortality (and Noosa on Weyba development would be
morbidity). The rating of each option directed onto Walter Hay Drive. Existing
is inversely related to: fauna exclusion (guide) fencing along Walter
the capacity to maintain low Hay Drive is to be completed as part of the
vehicular speeds (i.e. < 50 kph) Noosa on Weyba project.
through road geometry and An increase in traffic volumes would still be
passive engineering design; and experienced on the upgraded sections of
the volume of traffic on the Hollett Road and Tidswell Road. However
Road Mortality 4
roadway. the number and length of straight stretches
of roadway where it will be difficult to
maintain vehicular speeds at or below 50kph
via road design is substantially reduced.
Consequently there is a decreased risk of
road trauma for native fauna.
Safe fauna passage infrastructure could also
be more cost effectively provided along
these shorter upgraded sections of roadway,
in comparison to the other Options.
Average Score 4.0
10.3 Civil Engineering
Table 10-3 Option 4 Assessment – Civil Engineering
Criteria Description Score Justification
The economic cost of the roadworks This option will provide significantly reduced
and associated infrastructure. cost due to the reduction in length of
Cost 5
Highest cost will equal the lowest upgrading Hollet Road East & West, as well
number. as a reduction in Tidswell Road upgrade.
The roads will have less culvert crossings in
The effect of the road on the
both Hollet Road and Tidswell Road which is
Stormwater stormwater and flooding aspects of 5
a benefit for maintenance. The works will not
the site
have any detrimental effect on flood levels.
Average Score 5.0
10.4 Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 4 has an
overall score of 11.0.
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗