Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                               Access Options Assessment
                                                                                                         Noosa on Weyba



       Criteria                       Description                   Score                   Justification
                                                                            reduction of approximately 56% in the extent
                                                                            of habitat loss compared to Option 1 and
                                                                            45% in comparison to Options 2, 3 and 5.
                        The impact that each option will have               This option will substantially reduce the
                        on the movement of native wildlife                  length of roadway that traverses otherwise
                        between areas of high value                         contiguous areas of high value bushland
                        bushland that is dissected by the                   habitat.
                        road option. The rating of the option               Under Option 4 approximately 0.95km of
Habitat                 is inversely related to the length of        4      upgraded roadway would traverse areas of
Fragmentation           roadway that is established and                     high value bushland habitat, compared to
                        operated through areas of high value                Options 2, 3 and 5, which would result in the
                        bushland (e.g. remnant vegetation                   establishment of approximately 2.25 km of
                        and Koala Bushland habitat).                        upgraded roadway through areas of high
                                                                            value bushland habitat.
                        There is a relationship between                     Relative to all other Options, a greater
                        traffic volumes and velocities and the              proportion of the traffic generated by the
                        likelihood that wildlife mortality (and             Noosa on Weyba development would be
                        morbidity). The rating of each option               directed onto Walter Hay Drive. Existing
                        is inversely related to:                            fauna exclusion (guide) fencing along Walter
                         the capacity to maintain low                      Hay Drive is to be completed as part of the
                             vehicular speeds (i.e. < 50 kph)               Noosa on Weyba project.
                             through road geometry and                      An increase in traffic volumes would still be
                             passive engineering design; and                experienced on the upgraded sections of
                         the volume of traffic on the                      Hollett Road and Tidswell Road. However
Road Mortality                                                       4
                             roadway.                                       the number and length of straight stretches
                                                                            of roadway where it will be difficult to
                                                                            maintain vehicular speeds at or below 50kph
                                                                            via road design is substantially reduced.
                                                                            Consequently there is a decreased risk of
                                                                            road trauma for native fauna.
                                                                            Safe fauna passage infrastructure could also
                                                                            be more cost effectively provided along
                                                                            these shorter upgraded sections of roadway,
                                                                            in comparison to the other Options.
                        Average Score                                4.0


10.3              Civil Engineering
Table 10-3 Option 4 Assessment – Civil Engineering
       Criteria                       Description                   Score                   Justification
                        The economic cost of the roadworks                  This option will provide significantly reduced
                        and     associated    infrastructure.               cost due to the reduction in length of
Cost                                                                 5
                        Highest cost will equal the lowest                  upgrading Hollet Road East & West, as well
                        number.                                             as a reduction in Tidswell Road upgrade.
                                                                            The roads will have less culvert crossings in
                        The effect of the road on the
                                                                            both Hollet Road and Tidswell Road which is
Stormwater              stormwater and flooding aspects of           5
                                                                            a benefit for maintenance. The works will not
                        the site
                                                                            have any detrimental effect on flood levels.
                        Average Score                                5.0


10.4              Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 4 has an
overall score of 11.0.




510119 13 September 2013                                   Cardno                                      13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                     Page 23

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.