Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
11 Option 4A Assessment
11.1 Transport
Table 11-1 Option 4A Assessment - Transport
Criteria Description Score Justification
This option provides two connections under
Walter Hay Drive between both parts of the
How easily does this access option
development as well as allowing for quick
provide connectivity between the two
Connectivity – connection to the external road network via
sides of the development and 3
Private Vehicles Walter Hay Drive. However, the potential
provide connectivity to the wider road
alternative access to the external road
network
network via Tidswell Road is removed,
forcing extra traffic to the roundabout.
Public transport would only be able to be
The ability to provide a realistic and
Connectivity – serviced with dead end running on the
suitable layout for public transport 1
Public Transport eastern side of the development given there
with this access option
is no north-south link via Tidswell Road.
This option allows access to Walter Hay
The impact that this access option Drive for both sides of the development. The
will have on the amenity of the residents of the eastern lots will be
Residential Amenity 4
surrounding residential areas and somewhat isolated without the Tidswell
road networks Road extension, creating a separation from
Noosa.
This option still provides opportunity to
provide pedestrian and cyclist connectivity to
the existing facilities and to access each
Connectivity – How conducive the proposed access
side of the development via the existing
Pedestrian and solution is to encouraging the use of 2
underpass. However, the opportunity for
Cyclist Active Travel Modes
local active travel is reduced, particularly as
there will be no alternative north-south link
via Tidswell Road.
A roundabout would cause some measure of
delay to traffic on Walter Hay Drive due to
A high level estimate of the impact local speed limit reduction and delay caused
Delay to Traffic on that an access of this type will have by the method of control. However, with
2
Walter Hay Drive on traffic capacity of Walter Hay access via Tidswell Road restricted, delays
Drive at the roundabout will be increased as all
eastern lots will be forced to use the
roundabout access.
Average Score 2.4
11.2 Ecology
Table 11-2 Option 4A Assessment - Ecology
Criteria Description Score Justification
The impact that each option will have This option is essentially the same as Option
on the extent of wildlife habitat in the 4 in respect of Habitat Loss except for
locality. The rating of the option is approximately 300m of additional road works
Habitat Loss inversely related to the associated 4 and associated habitat clearance. Option
extent of vegetation and habitat 4A would require substantially less habitat
clearance. loss than any of the other options, except
Option 4.
The impact that each option will have This Option will result in further
Habitat on the movement of native wildlife fragmentation of habitat areas in comparison
between areas of high value 3 to Option 4, due to the impact of this option
Fragmentation
bushland that is dissected by the on the existing emergency access culvert
road option. The rating of the option beneath Walter Hay Drive which acts as a
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗