                                                                                                Access Options Assessment
                                                                                                          Noosa on Weyba



       Criteria                       Description                   Score                   Justification
                        operated through areas of high value
                        bushland (e.g. remnant vegetation
                        and Koala Bushland habitat).
                        There is a relationship between                     Relative to Options 1, 2 and 3, a greater
                        traffic volumes and velocities and the              proportion of the traffic generated by the
                        likelihood that wildlife mortality (and             Noosa on Weyba development would be
                        morbidity). The rating of each option               directed onto Walter Hay Drive. Existing
                        is inversely related to:                            fauna exclusion (guide) fencing along Walter
                         the capacity to maintain low                      Hay Drive is to be completed as part of the
                             vehicular speeds (i.e. < 50 kph)               Noosa on Weyba project.
                             through road geometry and                      An increase in traffic volumes would still be
Road Mortality               passive engineering design; and         3      experienced on both Hollett Road and
                         the volume of traffic on the                      Tidswell Road, which both have straight
                             roadway.                                       stretches of roadway that will make it difficult
                                                                            to maintain vehicular speeds at or below
                                                                            50kph. Consequently there is an increased
                                                                            risk of road trauma for native fauna.
                                                                            The length of number of straight stretches of
                                                                            roadway under Option 5 is equivalent to
                                                                            Options 2 and 3, but less than for Option 1.
                        Average Score                                2.3




12.3              Civil Engineering
Table 12-3 Option 5 Assessment – Civil Engineering
       Criteria                       Description                   Score                   Justification
                        The economic cost of the roadworks
                                                                            This option will provide increased cost
                        and     associated    infrastructure.
Cost                                                                 3      compared to Option 2 & 3 due to the
                        Highest cost will equal the lowest
                                                                            roundabout on Walter Hay Drive.
                        number.
                                                                            The roads will have one less culvert crossing
                        The effect of the road on the
                                                                            than Option 1 which is a benefit for
Stormwater              stormwater and flooding aspects of           4
                                                                            maintenance. The works will not have any
                        the site
                                                                            detrimental effect on flood levels.
                        Average Score                                3.5


12.4              Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 5 has an
overall score of 9.8.




510119 13 September 2013                                   Cardno                                        13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                       Page 27

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.