Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
12 Option 5 Assessment
12.1 Transport
Table 12-1 Option 5 Assessment - Transport
Criteria Description Score Justification
How easily does this access option This option provides vehicular connectivity
provide connectivity between the two between both sides of the development and
Connectivity –
sides of the development and 5 allows for a quick, legible connection to the
Private Vehicles
provide connectivity to the wider road external road network via Walter Hay Drive
network and Tidswell Road.
Public transport would be able to divert from
The ability to provide a realistic and Walter Hay Drive to serve the development
Connectivity –
suitable layout for public transport 4 by extending through Tidswell Road. The
Public Transport
with this access option western side would be served via a short link
with a turnaround provision.
The impact that this access option This option allows access for both sides of
will have on the amenity of the the development with little impact on the
Residential Amenity 4
surrounding residential areas and existing Tidswell Road and Hollett Road
road networks residents.
This option still provides opportunity to
Connectivity – How conducive the proposed access provide pedestrian and cycle connectivity to
Pedestrian and solution is to encouraging the use of 4 the existing facilities and to access each
Cyclist Active Travel Modes side of the development via the existing
underpass.
A roundabout would cause some measure of
delay to traffic on Walter Hay Drive due to
A high level estimate of the impact
local speed limit reduction and delay caused
Delay to Traffic on that an access of this type will have
3 by the method of control. However a
Walter Hay Drive on traffic capacity of Walter Hay
roundabout is in keeping with the
Drive
predominant method of traffic control on the
surrounding road network.
Average Score 4.0
12.2 Ecology
From an ecological perspective the only functional difference between Option 5 and either Option 2 or Option
3 is that the roundabout proposed under Option 5 should mean that the majority of the traffic movements
generated by the Noosa on Weyba development are likely to be directed onto Walter Hay Drive as opposed
to the external road network via Hollett Road or Tidswell Road.
Table 12-2 Option 5 Assessment - Ecology
Criteria Description Score Justification
The impact that each option will have This option will involve less clearance of
on the extent of wildlife habitat in the existing wildlife habitat than either Option 1
locality. The rating of the option is or 2A to facilitate necessary upgrades to
inversely related to the associated both Hollett Road and Tidswell Road. The
Habitat Loss 2
extent of vegetation and habitat extent of habitat loss would be similar to
clearance. Options 2 and 3 with approximately 1.85km
of Hollett Road and 1.5km of Tidswell Road
being upgraded.
The impact that each option will have Similar to Options 2 and 3, this option will
on the movement of native wildlife result in the establishment of approximately
Habitat between areas of high value 2.25 km of upgraded roadway that traverses
bushland that is dissected by the 2 otherwise contiguous areas of high value
Fragmentation
road option. The rating of the option bushland habitat situated either side of
is inversely related to the length of Hollett Road and Tidswell Road.
roadway that is established and
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.