response to info 37 bottlebrush · MCU22/0087
9. Access driveway - Provide additional comment and detail on the longitudinal
section and the relevant plans regarding the following:
a. the condition of the existing timber retaining wall in the road reserve and
the impacts of the new works on any retained sections of the existing
timber retaining wall
b. any new retaining walls in the road reserve and their connection to any
retained sections of the existing timber retaining wall
c. any buried services in the road reserve and the vertical clearances to the
proposed works. Please note that the clearances must be in accordance
with the service authorities standards
d. Amend the alignment such that the driveway is a straight alignment that
is perpendicular to the kerb and garage entry and reduce the width of the
driveway to 5.5m at the kerb line (sufficient for vehicles to pass).
Reconfigure the on street spaces to provide the maximum number of
spaces given the constraints. Please note that the reconfigured spaces
must be in accordance with AS2890
10. External works (kerb and channel, footpath, carparking etc). Provide
additional detail on the relevant plans regarding the following:
a. the dimensions, locations, levels and grades of the proposed kerb and
channel sufficient for construction
b. the deletion of the proposed footpath in the road reserve
c. provide a flat area adjacent to the back of the kerb sufficient to provide
for door opening, waste bin collection etc
d. the notation on the plans amended to indicate that the existing vehicle
driveway in Berrima Row will be removed as part of the works
11. Provide additional detail on the proposed 2 pedestrian access points to
Bottlebrush Avenue. The detail must be sufficient for construction purposes
and extend from the property boundary to the road formation.
Recor provide updated engineering drawings locating the services and exiting timber
retaining wall within the road reserve. The driveway location has been amended in
coordination with the arborist and landscape architect to ensure the retention of the
important trees within the frontage, removal of the existing ‘failing’ timber retaining wall
and establish a landscaped battered reserve in front of the boundary retaining wall (no
higher than 1.2m in height).
Further detail is provided for the new kerb to be established around the frontage to
preserve the exiting trees. Earthworks are required within the Bottlebrush frontage to allow
for the revised design, which provides for two compliant parking spaces and a driveway
that allows for cars to enter and leave the site in a forward gear without scraping the
concrete, and a width of 4m in accordance with RS-050 and RS-051.
Page 6 of
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to info 37 bottlebrush.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.