response to info 37 bottlebrush · MCU22/0087
12. Provide additional detail on the proposed retaining construction methods to
be undertaken on site. The detail must be prepared by a suitably qualified
person (Registered Professional Engineer of Queensland) and include but
not be limited to:
a. The proposed method and methodology. Please note that all structures,
anchors etc both above and below ground level, both temporary or
permanent, must be wholly contained within the subject site unless
written permission from the adjoining land owner is provided to Council
b. The measures to be undertaken to ensure that the development works do
not adversely impact on the structural integrity of any adjoining lands,
buildings, services and vegetation
The Geotechincal report details numerous recommendations regarding fill material, stormwater,
shoring, piling, compaction and footing design. The preliminary drawings from Recor include
notations referring to the geotechnical investigations as shown below – with further detailed design
to be undertaken as part of the subsequent building approvals. There are no identified concerns in
the reporting that will affect the design and construction.
ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY
BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF RETAINING WALL DRAINAGE
INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING WALLS ARE TO BE
PREPARED IN ACCORDANCE WITH STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN
CONFORMANCE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.
Page 7 of
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to info 37 bottlebrush.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.