Original source · versioned page text
2021-02-25 Special Meeting Agenda
The original of this document is very large (29.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING AGENDA 25 FEBRUARY 2021 Figure 16: Aerial photograph detailing Urban Growth Boundary (blue line) and 144 Myall Street outlined in red Figure 17: Aerial photograph detailing Priority Infrastructure Area (blue line) and 144 Myall Street outlined in red The proposal is also in conflict with the scheme outcomes which seek to protect water quality within the water supply catchment area by limiting development and preserving open space. It is also noted that a private sewerage pump is proposed which raises concern with regards to water quality should the system fail or not be appropriately maintained. Page 27 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.