Original source · versioned page text
6.5.22 - Flooding Report 5 may
The original of this document is very large (21.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
provides an opportunity to address the risks of isolation and subsequent risk to life and
potential burden to emergency services and has been commonly used in development
assessment for larger developments”.
Further to this, that subsequent that Council Disaster Management Plan includes
communications to these future residents that their building envelopes serve as a flood
refuge should an event greater than the 1% AEP event occur. This information could also be
conveyed via property note.
Table 4-6: PMF Time of Inundation and Rate of Rise.
Duration (hours) Time to become not Time of Submergence
trafficable (hours) (hours)
2 0.5 2.0
3 0.6 2.8
6 0.8 4.9
12 1.3 8.0
24 6.9 5.75
48 22.8 4.8
4.3.3. Flood Hazard Overlay Code Response
Code responses to Flood Hazard Overlay Code is presented in Appendix K.
21-0288-FS001-V5 | Flood Investigation | 60 Glenridge Drive, Cooroibah | 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.