Original source · versioned page text
2212-32529 SRA Response with conditions
Attached to the e-mail MCU22/0203 and OPW22/0304 - SRA application correspondence - SARA referral agency response.
2212-32529 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Operational work
The chief executive administering the Planning Act 2016 nominates the Director-General of Transport and
Main Roads to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:
1. All vessels, structures, plant, and equipment associated with the For the duration of
construction of the approved works must be lit/marked in accordance works and for
with the following specifications and requirements such that undertaking operation to be
the construction works does not cause a risk to the safe navigation of maintained at all times
ships:
(a) any anchors deployed must be marked with yellow buoys and
fitted with FL yellow lights fitted
(b) lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
2. (a) Prepare a Marine Execution Plan (MEP) by an appropriately (a) and (b)
qualified person(s), that includes, but not limited to the following: At least 20 business
i. demonstrating that the construction and operation of the days prior to the
development will not impede the safe navigation of other commencement of
vessels or restrict safe access to or from neighbouring works
structures
ii. is consistent with any requirements of Maritime Safety (c) For the duration of
Queensland guidelines for major development proposal works
iii. lighting/marking requirements, any anchors deployed must be
marked with yellow buoys and fitted with FL yellow lights
fitted. Any floating plant, equipment and pipelines shall be
appropriately lit and / or marked to the satisfaction of the
Harbour Master.
(b) Submit to the Marine Execution Plan (MEP) prepared in accordance
with part (a) of this condition to
[email protected] or mailed to:
Maritime Safety Queensland
PO Box 1094
Mooloolaba 4557
(c) Carry out the construction and dredging as applicable in accordance
with the Marine Execution Plan (MEP) in accordance with part (a) of
this condition.
The chief executive administering the Planning Act 2016 nominates the Director-General of Environment
and Science to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:
3. The construction of the dredge channel, sand plugs and beach For the duration of the
nourishment must be undertaken generally in accordance the plans works
State Assessment and Referral Agency Page 4 of 13