2212-32529 SRA Response with conditions
Attached to the e-mail MCU22/0203 and OPW22/0304 - SRA application correspondence - SARA referral agency response.
2212-32529 SRA
No. Conditions Condition timing
titled:
i. General Arrangement
ii. Typical Sections and Volumes.
4. Submit “As Constructed drawings” to [email protected] or mail to: Within two (2) weeks of
the completion of the
Department of Environment and Science
works
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
5. (a) In the event that the works cause disturbance or oxidisation of acid (a) Upon disturbance
sulfate soil, the affected soil must be treated and thereafter or oxidisation until
managed (until the affected soil has been neutralised or contained) the affected soil
in accordance with the current Queensland Acid Sulfate Soil has been
Technical Manual: Soil management guidelines, prepared by the neutralised or
Department of Science, Information Technology, Innovation and the contained
Arts, 2014.
(b) At the time the
(b) Certification by an appropriately qualified person, confirming that soils have been
the affected soil has been neutralised or contained, in accordance neutralised or
with (a) above is to be provided to [email protected] or mailed contained
to:
Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
6. Sand placed under this approval, must not cover any dune vegetation. At all times
7. Beach nourishment is to be finished to a maximum of 1 vertical: 3 At all times.
horizontal ratio for the material being placed.
8. Sand for beach nourishment must be excavated only from the sand At all times.
extraction zone denoted within General Arrangement, prepared by
BMT, Drawing Number A10342-02-02.
9. Sand must have the following characteristics: At all times.
(a) the sand used for the work is not finer than the upper beach sand
at the site
(b) the sediment is clean, free of contaminants and does not contain
any building waste or rock.
10. (a) Prepare a hydrographic survey plan by a registered surveyor in Within one month of
accordance with Standards for Hydrographic Surveys within completion of the
Queensland Waters to Class A of the dredge area and the works
immediate adjacent area likely to be affected by the dredging.
State Assessment and Referral Agency Page 5 of 13