Council archive · source document
3B-326 - Letter to Applicant - Change to Existing Approval [As Published] · 51993.1022.02
Officer: Tracy Jones
Direct Telephone: (07) 5449 5228
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 1993/1022
Your Reference:
5 October 2009
Philip Andrew Staley & Michael Collins
CARE KHA Development Managers
PO Box 6380
MAROOCHYDORE BC QLD 4558
Dear Sir
Re: Application for a Change to a Development Approval for 3B-326 situated at 56 Duke
Street, Sunshine Beach described as Lots 0, 1, 2, 3, 4, 5 & 6 BUP 102018
I refer to your request to make a change to the above development approval of 16 December 1993.
On 25 September 2009 Council decided to agree to approve the change subject to the following
additional conditions.
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Ground Floor Plan 0809-010 - DA-001, prepared by Andrew Bock June 2009
Proposed Uses Architecture
Upper Floor Plan 0809-010 - DA-002, prepared by Andrew Bock June 2009
Proposed Uses Architecture
Shop front Elevation 0809-010 - DA-003, prepared by Andrew Bock June 2009
Architecture
Street Perspective Perspective Plan 1 undated
(Corner Duke &
Bryan)
Street Perspective Perspective Plan 2 undated
(Duke)
Street Perspective Perspective Plan 3 undated
(Bryan)
General
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Goods Display
3. All goods are to be displayed on site within the property boundaries and/or on the premises
approved for the use.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Outdoor Dining
4. Outdoor dining areas are limited to those areas shown on the approved plans and shall be
clearly delineated at all times when in use.
Site Improvements
5. Any changes to landscaping and footpath treatments of the site shall be in accordance with
the recommendations of Council’s Place Design & Standards Manager of Council to ensure
the development is integrated with the streetscape.
Hours of Operation
6. Restaurants and associated bars are permitted to operate between the hours of 7am to 11pm
Sunday to Thursday, and 7am and 12 midnight Friday and Saturday.
Contributions Towards Council Infrastructure
7. Monetary contributions shall be paid to Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the
contribution amounts under the current Council policies and requirements is outlined in the
table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $41
PSP16 – Sewerage Headworks Contributions $539
PSP17 – Water Supply Headworks Contributions $728
PSP20 – Pathway Trunk Network Contributions $41
TOTAL Contribution Amount = $1,349
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from June 2009 until the date of payment.
All contributions must be paid prior to the commencement of the use.
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/ Uses
and applicable quantities:-
Existing Development Approved Development
Existing Approved
Existing Use Class / Use Approved Use Class / Use
Quantity Quantity
Lot 5
Lot 5 2
97.5m Entertainment and Dining – 2
Entertainment and Dining – 105m Use Area
Use Area Type 1 - Food and Bev
Type 1 - Food and Bev
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $2,728 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from June 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
Page 3
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works
within the boundaries of the development site shall be obtained from Council’s Plumbing
Services Section prior to obtaining a Development Permit for Building Works
A copy of the original approval is enclosed for your reference.
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act is also attached.
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision, the reports and staff
recommendations regarding this application are available for viewing or purchase at the Level 2
counter of Council offices. It would assist Council staff if you could bring this letter with you.
Yours faithfully,
Tracy Jones
Senior Development Planner
Used in these records
3B-326 - Letter to Applicant - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 12 KB (small file)
- File type
No other editions are linked here.