Council archive · source document
3B-326 - Letter to Applicant - Change to Existing Approval [As Published] · 51993.1022.02
Outdoor Dining
4. Outdoor dining areas are limited to those areas shown on the approved plans and shall be
clearly delineated at all times when in use.
Site Improvements
5. Any changes to landscaping and footpath treatments of the site shall be in accordance with
the recommendations of Council’s Place Design & Standards Manager of Council to ensure
the development is integrated with the streetscape.
Hours of Operation
6. Restaurants and associated bars are permitted to operate between the hours of 7am to 11pm
Sunday to Thursday, and 7am and 12 midnight Friday and Saturday.
Contributions Towards Council Infrastructure
7. Monetary contributions shall be paid to Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the
contribution amounts under the current Council policies and requirements is outlined in the
table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $41
PSP16 – Sewerage Headworks Contributions $539
PSP17 – Water Supply Headworks Contributions $728
PSP20 – Pathway Trunk Network Contributions $41
TOTAL Contribution Amount = $1,349
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from June 2009 until the date of payment.
All contributions must be paid prior to the commencement of the use.
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/ Uses
and applicable quantities:-
Existing Development Approved Development
Existing Approved
Existing Use Class / Use Approved Use Class / Use
Quantity Quantity
Lot 5
Lot 5 2
97.5m Entertainment and Dining – 2
Entertainment and Dining – 105m Use Area
Use Area Type 1 - Food and Bev
Type 1 - Food and Bev
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $2,728 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from June 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3B-326 - Letter to Applicant - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 12 KB (small file)
- File type
No other editions are linked here.