                 Figure 2-3: Six Mile Creek Flood Study 1% AEP (2100) DFE levels (Source: Hydralogic)



                 2.1.2.      Flood free area
                 Performance Objective PO2 (Flood Hazard Overlay table 8.2.6.3, Noosa Plan 2020) states that “all lots have
                 sufficient area that is above the DFE flood level… to safely and adequately accommodate the intended use.” The
                 acceptable outcome (AO2) is that “The minimum area above flood level (flood free area) for each lot, is in
                 accordance with Table 8.2.6.5”, which is summarized below.

                 Table 2-1: Minimum Size of Flood Free House Site Areas or Development Areas for Lots (Table 8.2.6.5, Noosa Plan 2020)
                  Zone                                        Modelled DFE or DSTE level or where not modelled, above the
                                                              highest known flood level

                  Recreation and Open Space                    1000m2 or 10% of the total site area, whichever is the greater.




                 The Cooroy sportsgrounds complex comprises four lots in total, including Noosa District Rugby League
                 Football Club, carpark and sports fields across Lot 1 on SP246688 and Lot 229 on SP246604, and the two
                 lots over which the development works are proposed (Lot 204 on plan MCH976 and Lot 157 on plan
                 MCH4833). The total flood free area for the four lots is 35% and approximately 3.46ha in area. Therefore,
                 the proposed development meets Acceptable Outcome A02. Refer to Figure 2-4 for an overview of the
                 flood free area available on site.




                 23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 5

Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
Log in to download the original file

Reference Documents - MCU23 0058 (As Published).pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.