Page text shows just the words. Original shows the document exactly as it was published.
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 2-5: LIDAR showing approximate extent of fill in the existing case.
Figure 2-6: Existing fill vs proposed fill for the developed case.
23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 7
Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.