Original source · versioned page text
Reference Documents - MCU23 0058 (As Published)
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 2-7: Proposed re-establishment of swales
2.1.4. Earthworks
Noosa Shire Council outlines requirements for earthworks for assessable developments subject to the
Flood Hazard Overlay Code as summarized in Table 2-1.
The following performance solution is proposed to meet performance objective PO10:
Filling, other than accessways:
a) does not extend more than the equivalent of 3 metres from existing fill measured from the
toe of existing fill.
b) is limited to a maximum of 500m2. Note that fill is estimated as being 360m2.
c) does not impact on the local drainage of adjoining properties.
23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 8
Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.