                 Table 2-1: Earthworks criteria for assessable le development (Source: Table 8.2.9.3 Noosa Plan 2020 PSP)

                 Performance Object                                                  Acceptable Outcomes
                  PO10                                                               AO10
                  Excavation and filling for operational works only                  Filling, other than accessways:
                  occur where they:
                                                                                          a)   does not extend more than the equivalent
                        a)   result in the protection, rehabilitation and                      of 3 metres around the main building,
                             repair of ecologically important areas,                           measured from the outer walls of
                             watercourses, drainage lines and                                  the building;
                             wetlands;                                                    b)   is limited to a maximum of 500m2; and
                        b)   do not adversely impact on the overall                             does not impact on the local drainage of
                             hydrology, hydraulics and flood capacity of                        adjoining properties.
                             a waterway;
                        c)   do not directly, indirectly or cumulatively
                             cause adverse impacts external to the site;
                        d)   do not cause increased flooding, which
                             adversely affects the safety or use of any
                             land upstream or downstream;
                        e)   do not cause ponding of water on
                             the site or nearby land;
                        f)   do not result in a reduction in flood
                             storage capacity;
                        g)   do not adversely affect the flow of water in
                             any overland flow path; and
                        h)   do not adversely affect the privacy or
                             visual amenity of surrounding property.




                 2.2.        Biodiversity, Waterways and Wetlands Overland Code
                 The proposed development is located withing the riparian buffer area shown in the Biodiversity, Waterways
                 and Wetlands Overlay code, refer Figure 2-8. The development is therefore subject to Performance
                 objectives as described in Appendix C.




                 Figure 2-8: Biodiversity, Waterways and Wetlands overlay (Source: Noosa Shire Council Interactive Mapping)




                 23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 9

Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
Log in to download the original file

Reference Documents - MCU23 0058 (As Published).pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.