Original source · versioned page text
Reference Documents - MCU23 0058 (As Published)
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Commercial in Confidence
This document is commercial-in-confidence. The recipient of this document agrees to hold all information presented
within as confidential and agree not to use or disclose or allow to use or disclosure of the said information to
unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the presentation or at any time
before, during or after an agreement has been reached, without prior written consent.
This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No responsibility is accepted
for the use of or reliance upon this report in whole or in part by any third party.
Limitations
The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is to display
information in accordance with the scope of services set out in the contract/quotation between Colliers | Engineering &
Design and its client. The scope of works and services were defined by the requests of the client, by the time and
budgetary constraints imposed by the client, and by the availability of access to site/s and information.
This report is prepared with information supplied by the client and possibly others which is presumed to be accurate and
complete. No responsibility is accepted for information that is withheld, incorrect or that is inaccurate, nor for changes
to the conditions over the passage of time or from latent circumstance or conditions. No warranty or guarantee is made
in relation to the data, findings and conclusions expressed in this report.
This report has been compiled at the level of detail specified in the report and no responsibility is accepted for
interpretations made at more detailed levels than so indicated.
Report Contact:
Name: Lochlan Gillis
Position Senior Engineer Water Resources
Phone: (07) 3532 1300
Document Control
Report Number
Version Date Details Prepared Checked Approved
01 26/4/23 For Issue LG KM KM
Flood Certificate
01A 02/5/23 LG KM KM
added
23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page i
Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.