Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Reference Documents - MCU23 0058 (As Published)

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                 Executive Summary
                 Colliers Engineering & Design have been engaged by Noosa Shire Council to prepare a Preliminary Stormwater
                 Management Plan in support of a development application on land located at 35 Mary River Rd, Cooroy QLD 4563
                 (Lot 204 on MCH976 and Lot 157 on MCH4833). This development application seeks a preliminary stormwater
                 management plan to address local planning requirements.

                 The site covers an area of 6.27ha and is zoned as Recreation and Open Space with a majority of the parcel
                 cleared with sports fields. The site is accessed by Mary River Rd to along the northern boundary, and is bounded
                 by Sportsground Parade to the west, Garnet Street to the south and Six Mile Creek to the East. The site is located
                 within the Six Mile Creek catchment which drains to the Mary River to the northwest.

                 The proposed development site is subject to Biodiversity, Waterways and Wetlands Overlay code, and Flood
                 Hazard Overlay code identified in planning scheme (PSP).

                 The flood hazard overlay code sets flood height requirements and hydraulic performance criteria for assessable
                 developments. The proposed building has a floor level set at 109.230 which is compliant with the minimum design
                 surface level outlaid in the code. The site satisfies the minimum flood free area in accordance with the code. The
                 proposed development involves filling within the floodplain and performance solutions have been proposed to
                 meet the intent of performance objectives regarding “filling and hydraulic performance” and “earthworks” within
                 the flood hazard overlay code.

                 The development is in accordance with acceptable outcomes outlines in the Biodiversity, Waterways and Wetlands
                 Overlay code. This is due to works being away from the waterway and within existing cleared areas of lowest
                 ecological value and works that do not necessitate the removal of vegetation within the riparian zone.




                 23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page i

Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
Log in to download the original file

Reference Documents - MCU23 0058 (As Published).pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.