1.2. Existing site drainage
To facilitate drainage through the site a series of swales and inlet pits with piped drainage convey minor
flows from the site towards Six Mile Creek to the east. Refer to Figure 1-2 below.
Figure 1-2: Site drainage
1.3. Proposed Development
The proposed development works at the site includes:
• New gymnasium (proposed addition to the west) – approved as per application 51994. 1373.01
(TPC 2736)
• Awning to the north of the gymnasium
• New club facilities to the eastern side of the building including services, amenities, changing
areas, and a store.
The proposed development includes terracing beside the building for spectators and construction of steps
and wheelchair ramp on the far eastern side of the building envelope. Refer to architectural plans in
Appendix A.
The existing building envelope measures approximately 1320m2. The proposed development is estimated
to have a total footprint area (including roof area, terracing, steps and wheelchair ramp) of around 3300m2.
The above figures exclude tanks, shed and cricket nets.
23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 2
Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.