                 Figure 1-3: Proposed development compared to existing sports complex footprint (Development plan source: Black Wood Architecture
                 and Design)



                 2. Planning Scheme Overlays
                 The proposed development site is subject to the Flood Hazard Overlay code (refer Figure 2-1), and
                 Biodiversity, Waterways and Wetlands Overlay code (refer Figure 2-8) identified in the Noosa Plan 2020
                 planning scheme (PSP).

                 An overview of the criteria that apply to the development within the Flood Hazard Overlay code and the
                 Biodiversity, Waterways and Wetlands code (Noosa Plan 2020) are summarized in tables within Appendix B
                 and Appendix C retrospectively. The tables also contain proposed measures to meet each of the
                 performance objectives.

                 Details regarding criteria within the planning scheme overlays are summarized below.




                 2.1.        Flood Hazard Overlay and Overland Flow
                 The purpose of the Flood Hazard overlay is to (1) assess appropriateness of development in flood hazard
                 zones while taking into account the expected effects of climate change, (2) mitigate or avoid hazards to
                 human life, property, community, economic activities, and the environment during such events, and (3)
                 restrict development that may worsen flood damage on-site or to surrounding properties.

                 The extent of flood inundation for minor to extreme events at the site is shown in Figure 2-1 and
                 inundation extents for minor to moderate flood events is shown in Figure 2-2.




                 23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP Page 3

Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
Log in to download the original file

Reference Documents - MCU23 0058 (As Published).pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.