(c) works programme identifying key components of the works and their respective
durations

(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues

(e) identification of complaint management procedures including:
(i) contact details for the on-site manager
(ii) dispute resolution procedures

(f) details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be fully
repaired at the applicant’s expense

(g) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.

HYDRAULICS AND WATER QUALITY

10.

11.

12.

13.

Qualified Person

For the purpose of certifying that the design of the rainwater harvesting system is in
accordance with the requirements of this decision notice, a qualified person is considered
to be a Registered Professional Engineer of Queensland (RPEQ), builder or plumber.

Lawful Point of Discharge

The applicant is advised that a lawful point of discharge for the development will need to be
determined and demonstrated as part of a detailed design solution included with the
Operational Works application.

Bioretention Basin Educational Signage

Suggested wording for the permanent educational signage required by this Decision Notice
is as follows:

“BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways
by reducing the amount of heavy metals, litter, suspended solids, and nutrients
discharged to (insert name of receiving waters)”.

Waste Management Operational Phase

For the purpose of demonstrating compliance with the waste management condition, the
applicant is requested to contact Council’s Waste Management Branch. The respective
waste collection vehicles (i.e. for collection of 2401 wheelie bins, 1100! and greater bulk
bins) and their dimensions will be provided upon standard drawings when requested.

Note: Council’s Waste Contract does not include the supply of waste compactor
equipment. Only the service of a compactor is provided under the contract by Council.
Subsequently the applicant must ensure that any compactor intended for use by the
development can be serviced utilising the Contractor provided Waste Compactor Servicing
Vehicle.

 

['9:

PROPERTY NOTES |

Not Applicable.

 

| 10.

PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME |

Not Applicable.

Page 12
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.