8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
The rising main crossing the north eastern corner of the site is no longer in use. No diversion is required. Pipework may exist in the ground and will need to be removed or slurry filled. A redundant gravity sewer pipe may be located within the southern portion of the site requiring removal or slurry filling. ENGINEERING 6. Footpath Connectivity It is advised to enter into discussions with the owner of the Noosa Civic (Lot 3 SP246584), so as to complete a small portion of footpath adjacent to the office buildings within the western portion of their site adjoining the small roundabout along Hoffman Drive. This small section of unfinished pathway within private property, will provide connectivity to both the Noosa Civic Shopping Centre and the proposed development. Building and Construction Industry (Portable Long Service Leave) Levy From 1 January 2000, the Building and Construction Industry (Portable Long Service Leave) Levy must be paid prior to the issue of a development permit where one is required for the ‘Building and Construction Industry’. This applies to Building Works, Operational Works and Plumbing and Drainage Works applications, as defined under the Sustainable Planning Act 2009, where the works are $80,000 or more and matching the definition of ‘Building and Construction Industry’ under the Building and Construction Industry (Portable Long Service Leave) Act 1991. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Should you require clarification in regard to the amendments to the Building and Construction Industry (Portable Long Service Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or (07) 3212 6855. Co-ordination of Operational Works Assessment To assist Council to undertake an integrated assessment of the operational works application, all aspects of the works must be included in one (1) application and be in accordance with Council’s planning scheme. Additional application fees apply to applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Preparation of a Preliminary Construction Management Plan The works identified in this Decision Notice will be required to be carried out in accordance with a Construction Management Plan endorsed by Council through an approval for Operational Works. To ensure expedient assessment of any Operational Works application, the applicant is advised to submit a preliminary Construction Management Plan that addresses the requirements of the planning scheme. In particular, the preliminary Construction Management Plan should address the following: (a) traffic management during all aspects of the construction phase including: (i) a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction (ii) maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased (iii) proposed fencing to the site during the construction phase of the development (iv) approval of the Traffic Management Control Plan by the Department of Main Roads (DMR) for any works on State controlled roads (b) maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.