Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
11: 12. 13. 14. 15. 16. 18. 19. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $35,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Built Form The exterior finishes indicated on the approved plans shall be maintained in the finished building, and include at minimum the modwood screen panels to the south elevation, PIR panels with exposed joints, FC sheet cladding, paint finish, groove lines to concrete wall panels in selected paint finish to those walls on the north. The canopy proposed to the front entrance of the Masters building shall be in accordance with the Approved Plans, and remain exposed and open as a roof on columns. s. The electrical transformer shall be located to the rear of the building, as indicated on the approved plans as ‘Transformer Option 1’. Signage Any advertising sign or device is to comply with Council's policies on advertising, alternatively, an application for Operational Works (Signage) is required for any signage in excess of this requirement. No signage is to be located along the northern elevation of the building facing Eenie Creek Road. Fencing Waste Management Refuse storage, removal and collection facilities must be provided in accordance with the following: (a) The provision of separate waste bins for general and recyclable waste must be provided. (b) The provision of hardstand impervious area for the permanent storage location of separate waste bins for general and recyclable waste; and (c) The provision of a purpose built enclosure to the bin store to provide visual and aesthetic screening from streets and pedestrian pathways. (d) The provision of a roofed wash-down area/s for the purpose of waste bin cleaning for all general and recyclable waste bins and fitted with a hose-cock and a drain connected to the sewer. The development site must provide for the entry and exit of waste vehicles from the site in a forward direction and the means, without difficulty to align the vehicle with any waste container (includes waste compactor equipment) and enable waste collection at any time scheduled for collection. The means to full-fill this requirement, details must be provided as part of the application for Operational Works approval and must include in particular: (a) Demonstration that all waste vehicles entering the site can appropriately manoeuvre on-site in accordance with the above and can readily align the collection vehicle with the waste containers, stored within a temporary on-site storage position to enable waste collection. *(Refer to Advisory Note) LANDSCAPING Landscaping Works Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.