8. Appendix E - Previous Approval

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

11:

12.

13.

14.

15.

16.

18.

19.

Performance Bond

Security in the form of a cash bond or trading bank guarantee to the sum of $35,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves
the right to call upon the bond or guaranteed sum to effect compliance with conditions.

Built Form

The exterior finishes indicated on the approved plans shall be maintained in the finished
building, and include at minimum the modwood screen panels to the south elevation, PIR
panels with exposed joints, FC sheet cladding, paint finish, groove lines to concrete wall
panels in selected paint finish to those walls on the north.

The canopy proposed to the front entrance of the Masters building shall be in accordance
with the Approved Plans, and remain exposed and open as a roof on columns. s.

The electrical transformer shall be located to the rear of the building, as indicated on the
approved plans as ‘Transformer Option 1’.

Signage

Any advertising sign or device is to comply with Council's policies on advertising,
alternatively, an application for Operational Works (Signage) is required for any signage
in excess of this requirement.

No signage is to be located along the northern elevation of the building facing Eenie
Creek Road.

Fencing
Waste Management

Refuse storage, removal and collection facilities must be provided in accordance with the
following:

(a) The provision of separate waste bins for general and recyclable waste must be
provided.

(b) The provision of hardstand impervious area for the permanent storage location of
separate waste bins for general and recyclable waste; and

(c) The provision of a purpose built enclosure to the bin store to provide visual and
aesthetic screening from streets and pedestrian pathways.

(d) The provision of a roofed wash-down area/s for the purpose of waste bin cleaning
for all general and recyclable waste bins and fitted with a hose-cock and a drain
connected to the sewer.

The development site must provide for the entry and exit of waste vehicles from the site in
a forward direction and the means, without difficulty to align the vehicle with any waste
container (includes waste compactor equipment) and enable waste collection at any time
scheduled for collection. The means to full-fill this requirement, details must be provided
as part of the application for Operational Works approval and must include in particular:

(a) Demonstration that all waste vehicles entering the site can appropriately
manoeuvre on-site in accordance with the above and can readily align the
collection vehicle with the waste containers, stored within a temporary on-site
storage position to enable waste collection. *(Refer to Advisory Note)

LANDSCAPING

Landscaping Works

 

Page 2
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.