20.

21.

22.

23.

The development site must be landscaped generally in accordance with the Landscape
Master Plan LC-02 Issue D dated 26/5/14 and prepared by LVO, except where amended
by these conditions. The works must be undertaken in accordance with an Operational
Works approval and The Noosa Plan Planning Scheme Policy 3 Landscaping Plants and
Guidelines and must include in particular:

Road frontages and covenant areas

(a) Landscaping treatments to all road frontages to provide screening of the
development.

(b) Restoration and replanting of all covenant areas and the northern road reserve
area adjacent to Eenie Creek Road to provide a visual buffer to the development,
including understorey, mid-story and canopy species in accordance with a
restoration plan submitted for operational works approval.

(i) vegetated screening of northern and eastern boundaries of the site
designed such that 75% of the bulk of the building, including roof form will
be screened within 5 years.

(c) vegetated screening of any electrical transformers, pumps bin storage areas or
ancillary mechanical plant equipment from the car park and road frontages.

Car park area
(d) Provision of 100 litre shade trees of local native species to every 6 car parks.
(f) Provision of dense understorey planting to car park shade tree mulched beds.

(g) Provision of permanent pedestrian cross over strips (i.e. pavement, pavers) to car
park shade tree beds to facilitate pedestrian movement, in order to prevent mulch
compaction in beds.

(h) Provision of root barriers to all car park shade trees adjacent to any storm water
treatment devices to prevent tree root infiltration of storm water media or pipes.

(i) Provision of 12 x 100 litre local native species in the garden beds on the southern
side of the pedestrian shared zone aisle.

(i) removal of all weeds species listed in the following standards and legislation:

(i) declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003

(ii) Undesirable species as listed in Planning Scheme Policy 3 Landscaping
Plants and Guidelines *(Refer to Advisory Note)

All landscape works must be established and maintained in accordance with horticultural
best practice with construction techniques and irrigation that allow for healthy, sustained
and vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.

All landscape works must be maintained generally in accordance with the approved
design for the life of the development.

Treatment of Temporarily Vacant Land

Where some or all of the land remains vacant or undeveloped for more than 3 months,
following the commencement of Stage 1, the following works must to be carried out:

(a) the site must be graded (to the same level as the adjoining footpath wherever
practicable) and turfed.

(b) the site must be landscaped with perimeter planting consisting of advanced
specimens of fast growing tree species.

(c) drainage must be provided to prevent ponding.

 

Page 3
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.