Original source · versioned page text
Sunshine Butterflies PLANNING REPORT v.1.4
Attached to the e-mail Development Application - Sunshine Butterflies - 1 of 2 MCU16/0090.
The subject site is a 2.02ha parcel of land located at 468 McKinnon Drive, Cooroibah, being Lot 2 on RP214534. The site has a 178m frontage to McKinnon Drive, and adjoins lots included in the rural settlement zone on the other three boundaries. The site has a 5 degree slope and falls approximately 6m across the site from the south western corner to the north eastern corner; in the last part via a series of three existing farm dams that retain drainage water for freshwater farm activity purposes (refer Attachment B) Pre-lodgment Meeting with Council In relation to the proposed development, a pre-lodgement meeting was held with Council Officers Kerri Coyle and Mark Lewis on 6th October 2015. The key points arising from the meeting are summarised as follows: The application will be for MCU - Impact Assessment. Site plans will be required to demonstrate access arrangements onto McKinnon Drive. Clarify the number of staff to be working at the facility. Clarify how students would attend the facility. Operational requirements for driveways and parking areas need to be detailed. The current development proposal addresses these issues as outlined in this report. Initial views of Council Officers were that the proposal had merit. Council may consider a request for fee reduction as a charity organization once the application has been received. 3.0 THE DEVELOPMENT PROPOSAL 3.1 General Description of Proposal The site is to be developed as the ‘Our Backyard Project’ which will become the new home of all Sunshine Butterflies activities and services including: - music, drama, art, cooking, woodwork, singing & theatre, puppet performances; - swimming activities, and; - hobby farm activities including horticultural, permaculture, gardening, environmental activities, yabbies in the dam & animal care. - respite service; - first aid training, - care programs and various support groups are provided. Existing buildings currently on the site are the respite house, pool and small decks, 2 water tanks, a tool and material shed, and another shed near the front of the site which will become the main office building. The dams, rural fencing, some gravel driveways and some landscaping already exist. The subject site is to be further developed to provide for the above services in accordance with the Our Backyard Landscape Concept Plan attached at Attachment A. The proposed development will include at completion: - new main administration office at the entry to the site (addition to existing shed), - respite house (3 bedroom wheelchair accessible house called “Butterfly House”, available for short or long term respite or family stays, available for use in 2017; an external respite service is also to be provided) - shed, 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.