Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Asset I.D. DA No.
System location:
Area: Catchment Area (ha): Bioretention Area (ha):
Civil drawing no.
Landscape drawing
no.
Role/Stakeholder Company Contact Name Contact Details
Developer
Site superintendent
(civil)
Site superintendent
(landscape)
Bioretention designer
Civil engineer
Landscape architect
Civil contractor
Landscape contractor
Council compliance
officer
Checklist of Sign-Off Forms
Date Name of Signatory & Role
Sign-Off Form Signature
Completed (e.g. Superintendent)
Pre-Start Meeting
Form A — Earthworks &
Functional Structures
Form B — Under-Drainage
Form C — Bioretention Media
Form D — Finished Levels
Form E — Coarse Sediment
Forebay
Form F — Protective
Measures
Form G — Landscape
Installation
Form H — Landscape
Establishment
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 2
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.