Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Pre-Start Meeting
List pre-start meeting attendees who are to sign indicating they have attended the meeting and understand the design
intent, construction and establishment process.
Location
Date
Role/Stakeholder Company Contact Name Sign
Developer
Site superintendent
(civil)
Site superintendent
(landscape)
Bioretention designer
Civil engineer
Landscape architect
Civil contractor
Landscape contractor
Other
Other
Other
Comments (attach and refer to additional pages if necessary)
Actions (attach and refer to additional pages if necessary)
FORM A — Earthworks and Functional (Hydraulic) Structures
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 3
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.