16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Rocks placed for energy dissipation
are of appropriate size and are in
correct location
Interface between forebay and filter
media is structurally sound and not
prone to collapse
HOLD POINT: Superintendent or bioretention designer inspection and sign-off before proceeding.
Comments (attach and refer to additional pages if necessary)
NB: As constructed survey and drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
FORM F — Protective Measures
Purpose: To ensure protective measures are correctly installed to protect the bioretention system while building is
occurring in the catchment.
Protection option adopted (Option 1, 2 or
3)
Option 1 — Surface protection during Action (if
Checked Satisfactory Initial
building phase unsatisfactory)
Continuous sediment fences installed
around perimeter of filter media and top of
batter.
Where landscape works are not to
commence immediately then cover batters
with filter cloth.
Protective covering (filter cloth + 25 mm
topsoil + turf) installed across entire filter
media area of system.
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 9
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.