Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Rocks placed for energy dissipation
are of appropriate size and are in
correct location
Interface between forebay and filter
media is structurally sound and not
prone to collapse

HOLD POINT: Superintendent or bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)




NB: As constructed survey and drawings and photos attached.


Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
FORM F — Protective Measures
Purpose: To ensure protective measures are correctly installed to protect the bioretention system while building is
occurring in the catchment.
Protection option adopted (Option 1, 2 or
3)
Option 1 — Surface protection during                                                       Action (if
                                                 Checked           Satisfactory                                             Initial
building phase                                                                             unsatisfactory)
Continuous sediment fences installed
around perimeter of filter media and top of
batter.
Where landscape works are not to
commence immediately then cover batters
with filter cloth.
Protective covering (filter cloth + 25 mm
topsoil + turf) installed across entire filter
media area of system.


                                CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                    SYSTEMS                                     9

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.