System installation
Top: The installation of the HumeGard® unit should conform
Preparing the
aggregate base to the local authority’s specifications for stormwater
(Step 2) pit construction. Detailed installation instructions are
Middle: dispatched with each unit.
Installing the main
bypass chamber
(Step 4) The HumeGard® unit is installed as follows:
Bottom: 1. Prepare the excavation according to plans.
Placing the main
chamber lid (Step 7) 2. Prepare the geotextile and aggregate base.
3. Install the main treatment chamber section.
4. Install the main bypass chamber
section/s (if required).
5. Fit the stainless steel comb (if required).
6. Connect the inlet and outlet pipes.
7. Place the main chamber lid.
8. Install the frame and access covers.
9. Backfill to specified requirements.
8 HumeGard® GPT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.