HumeGard® GPT
Design information Sizing HumeGard® GPTs
To design a system suitable for your project it is The large storage volumes of the HumeGard® GPT
necessary to review the configuration of the stormwater enables more pollutants to be captured before
system, the location and purpose of other stormwater maintenance is required, which greatly reduces its
management (WSUD) controls, the catchment area and lifecycle costs. In accordance with accepted hydraulic
the hydrology. principles the larger volumes in the HumeGard® GPT
results in lower velocities through the device, minimising
scour and re-suspension of sediment.
Configuration of the stormwater system
Humes Water Solutions has developed a design
The configuration of the stormwater system is important request form (see page 30) for stormwater designers to
since the HumeGard® GPT operates with an “in-line”, 45° complete and return to obtain a detailed design of the
or 90° alignment. Inlet pipe grades between 0.5% and appropriate device.
5% are recommended for at least five pipe diameters
upstream of the HumeGard® GPT. The pipe grade and
flow velocity will determine whether a super-critical unit MUSIC/pollutant export model inputs
is required.
Many local authorities utilise MUSIC or other pollutant
export models to assist in stormwater treatment train
Location in the stormwater system selection, and recommend generic inputs for GPTs.
Considering these against the independent research
Depending upon the site, the GPT can be oriented to results, the following conservative removal efficiencies
have the treatment chamber on the left or right side of (refer to Table 3 below) are recommended for the
the pipe to suit constraints. Humes Water Solutions can HumeGard® GPT on an annual basis (i.e. no bypass).
work closely with stormwater designers to select the
appropriate location and orientation for their system.
Table 3 – MUSIC inputs for HumeGard® GPTs
Catchment area
Pollutant Removal efficiency
Gross pollutants 90%
Research presented in Australian Runoff Quality (litter, vegetation)
(Engineers Australia 2006) concluded that roughly
TSS 41%
1 m3/hectare/year of gross pollutants and sediment
TP 34%
could be expected from a typical residential catchment.
Therefore, GPTs designed for an annual maintenance TN 24%
interval should have a pollutant storage capacity roughly
equal to the number of hectares of catchment it treats
(e.g. 10 hectare catchment = 10 m3 pollutant storage).
HumeGard® GPT 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.