16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Purpose of this guide
This guide outlines the construction procedures and requirements for the
installation of the HumeGard® GPT. This document should be reviewed by
supervisory personnel prior to commencing any HumeGard® GPT installation.


The following information is of a general nature only and    It is the responsibility of the site owner and its
is not intended to be exhaustive or impose or imply any      contractors and consulting engineers to determine the
paticular requirements and should be read in conjunction     site’s suitability for construction, including access for
with project-specific documents including the contract,      plant, equipment and other issues.
project specifications and project drawings. This guide is
not a substitute for the project documentation.              Nothing in this guide is to be construed as a
                                                             representation, endorsement, promise, guarantee or
For typical installation requirements please refer to the    warranty whether expressed or implied.
Humes general assembly standard drawings or Humes
project-specific drawings. These are system assembly         Humes makes no representation or warranty, implied
drawings only and do not constitute and should not           or otherwise that, amongst others, the content of this
be construed as a site layout; the site layout should be     guide is free from errors or omissions or in relation
specified in project documents provided by the consulting    to the adequacy of the information contained in this
engineer who has been engaged by the asset owner.            guide and where appropriate you will seek verification
                                                             from an independent third party before relying on
Where the contents of this guide differ from project         any information in this guide. Humes is not liable or
specifications and drawings, supervisory personnel           responsible to any person for any use or reliance of any
should consult with a Humes engineer. In the event           information arising out of or in connection with this guide.
of any conflict between the information in this guide
and local legislative requirements, the legislative
requirements will take precedence.
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.