Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Safety advice The HumeGard® GPT must be installed in accordance with all relevant health and safety requirements, including the use of PPE and fall protection where required. Confined space entry Installation of the unit may require confined space entry. All equipment and training must comply to SHE regulations. It is the responsibility of the contractor or person/s entering the unit to proceed safely at all times. Personal safety equipment The contractor is responsible for the provision of appropriate personal protection equipment including, but not limited to safety boots, hard hat, reflective vest, protective eyewear, gloves and fall protection equipment. Make sure all equipment is used by trained and certified personnel, and is checked for proper operation and safety features prior to use. Handling The customer is responsible for unloading of the precast components from the delivery vehicle. The customer should familiarise themselves with the site conditions, having regard for suitable space above and around the excavation in order to install the unit safely. Particular attention should be given to safety hazards such as overhead power lines and other services in the vicinity when considering positioning of cranes.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.