HumeGard® GPT
3. Delivery
In most cases, the HumeGard® GPT will be delivered in
the following parts:
• a main chamber (encasing the boom, weir, baffles,
retention comb, internal slab). In the case of high
chamber mass (over 15 t) the main chamber may
consist of two parts (base and top section)
• a lid
• access covers and frames
• in the case of a two part chamber, loose stainless steel
retention comb components
A crane and lifting gear will be required to unload the
delivery vehicle. The crane must be of adequate capacity
to lift and lower the components into position. The
crane should be located to allow manoeuvrability of the
components into their correct position.
The main chamber and lid are designed for a maximum
sling angle of 60 degrees preferably using a differential
spreader beam connected via four lifting anchors on the
component. The size of the lifting anchors is shown on
the HumeGard® product drawing and must be advised to
the crane operator when booking the crane.
HumeGard® GPT 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.