Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                  HumeGard® GPT
6. Inspection of internal elements

For HumeGard® models that are supplied with some or
all of the stainless steel components separate, a Humes
representative should be consulted regarding their
correct fitting and adjustments.




7. Lid alignment and sealing

The lid must be joined to the main chamber using a
cement mortar layer approximately 10 mm in thickness
or suitable mastic sealant over the entire top surface
of all bearing walls. This will secure the lid to the main
chamber and ensure an even transfer of load stresses
down through the unit. The openings in the lid must be
positioned relative to the inlet and outlet sides of the
chamber as shown on the construction drawing supplied
with the large opening above the storage /retention area
on the inlet side.




8. Completing the installation

Once the lid is secure, if required, access chambers can be
constructed from the level of lid openings to the finished
surface level. Unless clearly stated otherwise, the supply
of these items is not included with the HumeGard®
components. The contractor is required to fit, cast-in
or bolt the access covers supplied to the top of access
chambers.


The remainder of the excavation can now be backfilled
and suitably compacted to the finished surface level.




                                                              HumeGard® GPT   5
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.