Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Appendix A1 – WCQP Design Phase Water Quality Control Pond Design Calculations Summary (Derived From Water By Design Guidelines) Water Quality Control Pond Design Assessment Checklist (Derived From Water By Design Guidelines) Energy Dissipater Calculations Critical Velocity Calculations MUSIC Modelling Details – Inflow Concentrations Into WQCP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.