16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                           Action
                  Consideration                                           Hazard / Comment                               Controlling Action                       Action By
                                                                                                                                                                                   Status
                                                                                                            Therefore access to the water edge is
                                                                                                            limited and the water edge is densely
                                                                                                            planted on a safety bench. No edge of water
                                                                                                            fencing is required.


 Temporary pond design                                  
 Wall Design:

 Handrails / edge protection                                    Fall hazard                                 All walls exceeding 1.0m in height to be            Designer/
                                                                                                           appropriate fenced                                  Landscape
                                                                                                                                                                Architect
 Product selection. Consider sustainability,                    Concrete and Boulder walls                  Standard Construction methods                       Contractor        Complete
 constructability, maintainability and manual           
 handling
 Fall protection requirements such as provision                 Fall hazard                                 All walls exceeding 1.0m in height to be            Designer/
 of anchorage points                                                                                       appropriate fenced                                  Landscape
                                                                                                                                                                Architect
 Workplace space and layout for constructing                    High wall construction                      Contractor to comply with all WH&S                  Contractor        During
 wall                                                                                                      requirements during construction                                      Construction
 Depth of footings                                              Conventional                                Contractor to comply with all WH&S                  Contractor        During
                                                                                                            requirements during construction and                                  Construction
                                                                                                           structural certification to verify wall
                                                                                                            construction.
 Possible future works around footings                  
 Load bearing restrictions                                      Load restrictions on retaining walls        Load restrictions specified on typical              Designer/         Ongoing
                                                                                                            retaining wall deigns. Contractor to comply         Contractor
                                                                                                           or provide alternative design certification for
                                                                                                            alternative products.
 Bridge Design:

 Structural capacity                                    
 Cast in-situ versus precast                            


Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                          Page 9 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                          Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.