Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                          Action
                  Consideration                                            Hazard / Comment                              Controlling Action                      Action By
                                                                                                                                                                                  Status

 Stormwater, Water and Sewer Design:

                                                                Compliance
 Flow capacity of pipes and structures                                                                     Comply to Standards                                Designer          Complete
                                                                Compliance
 Structural capacity of pipes and structures                                                               Comply to Standards                                Designer          Complete

                                                                Compliance
 Cast in-situ structures                                                                                   Comply to Standards                                Designer          Complete

                                                                Compliance
 Pre-cast structures                                                                                       Comply to Standards                                Designer          Complete

 Access to pipes and structures – i.e. ladder                   Compliance                                  Comply to Standards                                Designer          Complete
 and fall protection requirements                       
 Stormwater Pond Design:

 Access to stormwater ponds including
 restricted access and access for maintenance           
 Stormwater pond water quality                          
 Permanent pond design                                          Drowning                                    Appropriate safety fencing and warnings            Contractor        During
                                                                                                            signs to be erected during construction.                             Construction
                                                                                                            Area to be avoid during periods of rainfall.
                                                                                                                                                               Designer          Finalise at
                                                                                                            The following safety measures have been                              OP Works
                                                                                                            incorporated into the basin design

                                                                                                               Thick planting and safety bench around
                                                                                                                the perimeter of the pond to discourage
                                                                                                                entry into pond
                                                        
                                                                                                               Retaining walls over 1m are to be
                                                                                                                fenced. Maximum height is 2.1m.

                                                                                                               There are multiple points around the
                                                                                                                basin with batter slopes flatter than 1 in
                                                                                                                5 to enable easy access out of the basin
                                                                                                                area

                                                                                                               1 in 6 access track provided at the
                                                                                                                downstream end of the basin

Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                         Page 8 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                         Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.