Skip to the record
The gold standard in government transparency.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

1        INTRODUCTION
Calibre Consulting (QLD) Pty Ltd has been commissioned by Palm Lake Resort to prepare a Stormwater Management
Construction & Maintenance Plan (SMCMP) Report to support the Operational Works Application for Stage 2 and
subsequent stages of the Palm Lakes Retirement Community development. The site is located on 2 & 4 Lamonts Road
and 19 & 20 Trading Post Road, Cooroy within the Noosa Shire Council (NSC) Local Government Area. This Operational
Works Application follows the MCU Development Approval (MCU 15/0111 & REC15/0031) for the site.

This project has an extensive history, involving an interim reduced site layout (excludes property on 20 Trading Post
Road/Lot 4 on RP215922), numerous submissions to and correspondence with Council to achieve approval of the
stormwater management strategy. The following outlines key submissions, specific to the construction management and
operational maintenance of the stormwater treatment devices on site. Further references to past documentation are
provided in Section 1.2.

   Operational Works – Bulk Earthworks Decision Notice Approval for Reduced Site Layout - Following various letter
    submissions of stormwater construction management and maintenance details (refer to Section 1.2 below), Council
    issued an Operational Works - Bulk Earthworks Decision Notice Approval (dated 15 October 2015) for the Palm
    Lakes development. In the process of gaining approvals a framework for the SMCMP Report (incorporating design
    checklists, construction and operation maintenance) was developed with Council and approved. This was
    documented in Framework Letter Report (No. B14158.W.07L dated 8 October 2015), which Council have referenced
    in their current Approval Conditions.

   Operational Works – Internal Stormwater and Drainage Works Approval for Stage 1A of the Reduced Site Layout –
    Calibre Consulting provided Stormwater Management Plan Report No. B14158.W-05B dated December 2015 and
    Stormwater Management Construction & Maintenance Plan (SMCMP) Report No. B14158.W-06A dated November
    2015 was issued to Council. Following various requests for information and responses from Calibre Consulting
    regarding stormwater management (refer to Section 1.2 for references for this documentation), Council granted
    approval for Internal Stormwater and Drainage Works in Stage 1A. The current SMCMP Report has taken into
    consideration Council’s various information requests and queries and incorporated these in this report.

   MCU Development Approval for Overall Site Layout – During the above processes for gaining approvals for the
    reduced site layout, a MCU Development Application (MCU 15/0111 & REC15/0031) was submitted for the overall
    site layout (including the property on 20 Trading Post Road/Lot 4 on RP215922). A revised stormwater management
    strategy (involving three major Bioretention Devices, one small Bioretention Pod, a Central Water Quality Control
    Pond with central and northern integrated detention systems) was developed based on the previous approved
    strategy for the reduced site layout. This was documented in the Concept Stormwater Management Plan Report (No.
    B14158.W-03A dated November 2015). A Concept SMCMP Report (No. B14158.W-09A dated January 2016) was
    submitted to Council. Following various requests for information (RFI’s) and responses from Calibre Consulting,
    Council granted MCU & REC approvals in Decision Notice (dated 22 July 2016) with conditions of approval.

This report has been provided to support the Operational Works Approval for Stage 2 and subsequent stages of the
overall site layout in accordance with Framework Letter Report (No. B14158.W.07L dated 8 October 2015) and by
addressing Council’s Decision Notice approval conditions. The following documents have also been provided to Council
together with this submission and should be read in conjunction with this report:

   Response to Stormwater Management Approval Conditions Letter (No. 16-001014.01L.ms.cm.docx dated 26
    September 2016) – provides a summary of responses to Council’s Approval Conditions regarding stormwater
    management.
   Stormwater Management Plan (SWMP) Report (No. 16-001014-01A dated September 2016) – provides details of
    the stormwater management strategy, detailed response to Council’s Approval Conditions, with corresponding
    analysis and investigations.




B14158.W-06B | SMCMP | PALM LAKE RESORTS                      COOROY RETIREMENT COMMUNITY, TRADING POST
                                                                                          ROAD, COOROY                  |1
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.