Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
1 INTRODUCTION Calibre Consulting (QLD) Pty Ltd has been commissioned by Palm Lake Resort to prepare a Stormwater Management Construction & Maintenance Plan (SMCMP) Report to support the Operational Works Application for Stage 2 and subsequent stages of the Palm Lakes Retirement Community development. The site is located on 2 & 4 Lamonts Road and 19 & 20 Trading Post Road, Cooroy within the Noosa Shire Council (NSC) Local Government Area. This Operational Works Application follows the MCU Development Approval (MCU 15/0111 & REC15/0031) for the site. This project has an extensive history, involving an interim reduced site layout (excludes property on 20 Trading Post Road/Lot 4 on RP215922), numerous submissions to and correspondence with Council to achieve approval of the stormwater management strategy. The following outlines key submissions, specific to the construction management and operational maintenance of the stormwater treatment devices on site. Further references to past documentation are provided in Section 1.2. Operational Works – Bulk Earthworks Decision Notice Approval for Reduced Site Layout - Following various letter submissions of stormwater construction management and maintenance details (refer to Section 1.2 below), Council issued an Operational Works - Bulk Earthworks Decision Notice Approval (dated 15 October 2015) for the Palm Lakes development. In the process of gaining approvals a framework for the SMCMP Report (incorporating design checklists, construction and operation maintenance) was developed with Council and approved. This was documented in Framework Letter Report (No. B14158.W.07L dated 8 October 2015), which Council have referenced in their current Approval Conditions. Operational Works – Internal Stormwater and Drainage Works Approval for Stage 1A of the Reduced Site Layout – Calibre Consulting provided Stormwater Management Plan Report No. B14158.W-05B dated December 2015 and Stormwater Management Construction & Maintenance Plan (SMCMP) Report No. B14158.W-06A dated November 2015 was issued to Council. Following various requests for information and responses from Calibre Consulting regarding stormwater management (refer to Section 1.2 for references for this documentation), Council granted approval for Internal Stormwater and Drainage Works in Stage 1A. The current SMCMP Report has taken into consideration Council’s various information requests and queries and incorporated these in this report. MCU Development Approval for Overall Site Layout – During the above processes for gaining approvals for the reduced site layout, a MCU Development Application (MCU 15/0111 & REC15/0031) was submitted for the overall site layout (including the property on 20 Trading Post Road/Lot 4 on RP215922). A revised stormwater management strategy (involving three major Bioretention Devices, one small Bioretention Pod, a Central Water Quality Control Pond with central and northern integrated detention systems) was developed based on the previous approved strategy for the reduced site layout. This was documented in the Concept Stormwater Management Plan Report (No. B14158.W-03A dated November 2015). A Concept SMCMP Report (No. B14158.W-09A dated January 2016) was submitted to Council. Following various requests for information (RFI’s) and responses from Calibre Consulting, Council granted MCU & REC approvals in Decision Notice (dated 22 July 2016) with conditions of approval. This report has been provided to support the Operational Works Approval for Stage 2 and subsequent stages of the overall site layout in accordance with Framework Letter Report (No. B14158.W.07L dated 8 October 2015) and by addressing Council’s Decision Notice approval conditions. The following documents have also been provided to Council together with this submission and should be read in conjunction with this report: Response to Stormwater Management Approval Conditions Letter (No. 16-001014.01L.ms.cm.docx dated 26 September 2016) – provides a summary of responses to Council’s Approval Conditions regarding stormwater management. Stormwater Management Plan (SWMP) Report (No. 16-001014-01A dated September 2016) – provides details of the stormwater management strategy, detailed response to Council’s Approval Conditions, with corresponding analysis and investigations. B14158.W-06B | SMCMP | PALM LAKE RESORTS COOROY RETIREMENT COMMUNITY, TRADING POST ROAD, COOROY |1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.