Skip to the record
Every meeting, every word.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

The design, management and maintenance procedures for stormwater management devices detailed in these
documents, also address previous concerns from Council and are in accordance with past approvals.

This report provides confirmation that Operational Works drawings are in accordance with design objectives, details on
construction management processes and operational maintenance monitoring procedures and corrective measures. This
is in accordance with relevant local and state guidelines, Council’s requirements and best management practices.

1.1       SCOPE OF THIS REPORT
The scope of this report is to address Council’s Approval Items by providing a Stormwater Construction Management and
Maintenance Plan for the proposed Stormwater Quality Improvement Devices (SQIDs). As per Framework Letter Report
(No. B14158.W.07L dated 8 October 2015) the performance indicators (under general management, management of
mosquitoes and cyanobacterial blooms) has been addressed during the each phase of the development, as listed below:

   Design Phase (Section 2.1 & 3.1);
   Construction & Establishment Phase (Section 2.2 & 3.2); and
   Operational & Maintenance Phase (Section 2.3 & 3.3).

Note that the structure of this report is different from the structure of the Framework Letter Report (2015) that determined
the basic criteria and framework for management of the SQIDs. This was undertaken to provide more clarity for the
readers during the different phases of the project (i.e. design, construction or operational phase), i.e. during the
construction phase all relevant details for management of the SQIDs are provided in one section. While the structure is
different, all criteria listed in the Letter Report (2015) has been incorporated in this report.




16-001014-02A | SMCMP | PALM LAKE RESORTS                        COOROY RETIREMENT COMMUNITY, TRADING POST
                                                                                             ROAD, COOROY                  |2
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.