16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Items Checked Satisfactory Action (if unsatisfactory) Initial
As-constructed survey completed and
attached to this form
Photos taken and attached to this form
Set out of wetlands is correct including
macrophyte zone, inlet zone and high-
flow bypass
Levels are at correct elevation (+50
mm) allowing for 300 mm topsoil and
where required 300 mm impervious
liner
HOLD POINT: Superintendent and wetland designer inspection and sign-off before proceeding.
Comments (attach and refer to additional pages if necessary)
NB: As-constructed survey or drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:
FORM B — Bunds and Impervious Liner
Purpose: To ensure the bunds are installed and sealed and the impervious liner is constructed as per the specifications
and the test results verify this.
Items Checked Satisfactory Action (if unsatisfactory) Initial
4
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.