Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
As-constructed survey complete for
top of bunds and liner
Laboratory tests results of liner
material submitted and adequate
Delivery docket of liner material
supplied
Liner material installed and sealed
as per specification
Geotechnical engineer certification
of in-situ compaction or liner
placement
Geotechnical engineer certification
of key bunds
HOLD POINT: Superintendent or wetland designer inspection and sign-off before proceeding.
Comments (attach and refer to additional pages if necessary)
NB: As-constructed survey or drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:
FORM C — Hydraulic and Functional Structures
Purpose: To ensure that the hydraulic structures associated with the wetland are constructed in accordance with design
and specifications.
Items Checked Satisfactory Action (if unsatisfactory) Initial
As-constructed survey completed
and attached to this form
5
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.