16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
As-constructed drawings marked up with final
plant species and densities
Water level control is operating appropriately
Correct mulch has been supplied and
installed to batters and bunds above the
extended detention and secured in place
HOLD POINT: Superintendent and wetland designer inspection and sign-off.
Comments (attach and refer to additional pages if necessary)
NB: As-constructed survey or drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:
FORM G — Macrophyte Zone Landscape Establishment
Purpose: To ensure the plants established.
Items Checked Satisfactory Action (if unsatisfactory) Initial
Weeds being removed as required
Watering occurring as required
Macrophyte plants have matured to a point
where water level in macrophyte zone can be
allowed to reach design level (typically 6–10
weeks after installation)
Macrophyte zone plants established (500 mm
above normal water level and propagation is
occurring)
9
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.