Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Inlet zone disconnected from
macrophyte zone (i.e. plates placed
on overflow pit and secured)
HOLD POINT: Superintendent or wetland designer inspection and sign-off before proceeding.
Comments (attach and refer to additional pages if necessary)
NB: As-constructed survey or drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:
FORM F — Macrophyte Zone Landscape Installation
Purpose: To ensure the correct plants are supplied, installed and established.
Items Checked Satisfactory Action (if unsatisfactory) Initial
Supplied plants are correct species
Species change must be approved by
wetland designer or ecologist and marked on
as-constructed drawings
Supplied plants are in correct pot sizes and
maturity (300mm min) and hardened
Plants have been installed at correct planting
density
8
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.