Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
WATER QUALITY CONTROL POND INSPECTION & MAINTENANCE CHECKLIST Stormwater Quality Improvement Device: Date: Location: Date of last Rainfall: Inspector: Weather Conditions: Time taken to complete inspection / Photos taken (Y/N) maintenance Addition Information Photos of Site (Explanatory Notes): 1. 2. 3. 4. 5. 6. General Comments and Sketches Officers Signature: Note: Maintenance details have been adopted from Water By Design’s Maintaining Vegetated Stormwater Assets – Version 1 (2012). Refer to this document for further details Performance indicators and monitoring triggers outlined in this document are subject to latest specifications provided in peer reviewed journal publications and health regulations. Updates are to be made where appropriate.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.